This project comprises the construction of 3.1kilometres of double–seal surfaced road around the Horse Shoe township in Ward 1 of the Greater Kokstad Municipality. The client is the Greater Kokstad Municipality and the project is funded by Municipal Infrastructure Grants. Scientific Roets (PTY) Ltd and Enacu Consulting Engineers are Joint Venture civil engineering consultants who have designed and are managing and supervising the construction of the road.

The Horse Shoe Road currently has two existing roads, Road 2 and Road 3, which have limited road reserves and dysfunctional storm water systems that need rehabilitation. Road 2 is 1.26km long and has an existing sub–base layer of 600m, and Road 3 is 1.69km long and has 400m of existing sub–base layer. The scope of construction works is to rip the existing sub–base layers and construct the road to a 4.5m wide double–seal surfaced road and to provide better storm water management.

Detailed construction activities:

  • Clearing and grubbing of existing road
  • Installation of concrete pipe culverts
  • Construction of inlet and outlet structures
  • Construction of mesh reinforced trapezium and V–drains
  • Mass earthworks to obtain required shape
  • Ripping existing sub–base layers
  • Road-bed preparation to 150mm thickness
  • Construction of the sub–grade and sub–base layers to 150mm thickness each
  • Construction of base course layer to 150mm thickness
  • Construction of double–seal wearing course
  • Provision of road traffic signs.
  • Testing the workmanship
  •  
The project is now (Jan 2008) at the mass earthworks stage and will be continued after the construction holidays.